Sorting, from arrival to dispatch.

Receive the bags, scan each parcel and prepare it for the right route. Scanning and exception handling run today; the conveyor and automatic diverter are planned.

Receive bagsScan parcelsGroup by route
Scanning runs today. The conveyor and automatic diverter are planned.

Follow a parcel through six steps.

01 / 06Receive incoming bagsBag received, manifest matched
01 / 06Running

Receive incoming bags

Match the bags arriving at the receiving door to the manifest.

WHAT IS SCANNED

Bag received, manifest matched

02 / 06Running

Open and scan

Open the bags and scan each parcel against its shipment.

WHAT IS SCANNED

Every piece linked to a shipment

03 / 06Planned

Onto the conveyor

A fixed scanner reads each piece.

WHAT IS SCANNED

Piece read in motion

04 / 06Planned

Automatic sort

A diverter pushes it to its route bin.

WHAT IS SCANNED

Route bin assigned

05 / 06Running

Resolve exceptions

Keep unmatched parcels separate and assign someone to resolve them.

WHAT IS SCANNED

Owner assigned, reason required

06 / 06Running

Bin to rider tray

Scan the parcels handed to the rider so the dispatch list shows what left.

WHAT IS SCANNED

Out-scan, rider and piece count

What to compare before adding automation.

Staffing

Compare handling time per parcel. Receiving, dispatch and exceptions still need people.

Time

Check both labour hours and dispatch time. A faster scan is useful only if the whole shift improves.

Cost

Compare labour savings with equipment, power and maintenance costs.

Compare the cost of sorting by hand and with a line.

The conveyor line is Planned. These are example figures. Change them to yours.

Shift hours and monthly costs

Monthly net saving (example)

₹59,400Example scenario

10,000 parcels/day · 8-hour shift

People per shift
11 to 5
Person-hours per day
83.3 to 33.3
Cost per parcel
₹0.99 to ₹0.76
How it works

Person-hours = daily volume divided by parcels per person-hour. People per shift = person-hours divided by productive shift hours, rounded up. Monthly labour = people times loaded person-day cost times operating days. Assisted cost adds equipment, maintenance and extra power. Net saving = manual labour minus assisted total cost.

Use a monthly equipment cost, including depreciation and financing as appropriate. Both rate inputs must cover the same end-to-end handling scope. Productive hours exclude breaks and downtime. Floor rent, tax and exception costs are excluded unless you include them yourself. No reduction in failed deliveries or sorting errors is assumed.

Send us one typical shift. We'll model your line.